Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Feb 21, 2021     Cockpit flood lights; Main switch panel installation - (4.2 hours)       Category: Electrical
1. Yesterday, I thought I might place a pair of LED flood light fixtures under the throttle quadrant and the main switch panel, but today I found different locations for them that are just as good -- on the bottom side of the cross-gear z-brace. I did the installation, ran power and ground wires for the right-hand one, and added the wires to an existing harness.

2. Pre-assembled the structural crossbar under the switch panel and zip-tied a protective plastic tube over it, to protect the wire harness nearby.

3. Blind-riveted the front half of the vertical channel cap to the fuselage, to allow for the installation of the main switch panel.

4. Installed the main switch panel, using #8 black stainless screws with nylon washers..


 